Re: Null-Space superior to Phased??
			 
             
			
		
		
		
		I was only mentioning the research cost for taking Energy Stream Weapons up to tech level 12 at high research cost.  The sum of the squares of all new numbers between 1 and 12 is 650 (1 +4 +9 +16 +25 +36 +49 +64 +81 +100 +121 +144).  5000 (the base cost for ESW) * 650 = 3,250,000. 
 
Ok, looks like you were including the cost of Physics 1 (50k). 
		
	
		
		
		
		
		
		
			
				__________________ 
				-Zan
			 
		
		
		
		
		
		
	
		
		
	
	
	 |