Re: Building an imprisoned immobile pretender
			 
             
			
		
		
		
		As per the manual, yes. 
 
The first additional point in a path costs either 8 (if you already have that path), or (new path cost).  The additional ones cost (8 x (additional point number)) each -- ex.  
 
Oracle starts with S3, so S3 -> S9 is 6 levels = 8*(1+2+3..+6) = 168.  Oracle doesn't have water at all, so W9 from nothin' is (new path cost, which I don't remember) + 8 * (2+...+9). 
		
	
		
		
		
		
		
		
			
				__________________ 
				Are we insane yet?  Are we insane yet?   Aiiieeeeee...
			 
		
		
		
		
		
		
	
		
		
	
	
	 |