| 
				 Retrofit Question 
 I am trying to do a retrofit.  The original design costs a total of 14.56k and the new design costs a total of 20.92k.  This is less than a 50% increase in vessel cost.  However the cost of the retrofit is more than 50% of the original cost.
 The "failure notice" states that the there can only be a maximum difference of 50% of the cost.  Does this mean the cost of the retrofit and not of the designs?
 
 Thanks...Greybeard
 |