.com.unity Forums
  The Official e-Store of Shrapnel Games

This Month's Specials

Air Assault Task Force- Save $8.00
Bronze- Save $10.00

   







Go Back   .com.unity Forums > The Camo Workshop > WinSPMBT > TO&Es
Notices


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #8  
Old October 5th, 2008, 03:34 PM

thatguy96 thatguy96 is offline
Captain
 
Join Date: Jul 2005
Posts: 801
Thanks: 3
Thanked 21 Times in 20 Posts
thatguy96 is on a distinguished road
Default Re: Transport for U.S. Patriot units.

Quote:
Originally Posted by KraMax View Post
Time of expansion/curling of complexes S-300 and S-400 = 5 minutes
I can believe the basic erection or collapsing of the system components might only take 5 minutes, but I guess I don't believe that that's all that's required for complete system operation. I would think various connections, either physical or not would have to be made between the FCS and missile launchers, and that various formalities (system diagnostics, etc) would have to be performed before the system could be termed "operational." The game doesn't really reflect any of this, so I maintain that moving these systems around in the "instant" game timeframe of loading and unloading and even with the 1-turn lag for firing them is sort of gamey. Not a problem, since it is a game.
Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 12:27 AM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©1999 - 2025, Shrapnel Games, Inc. - All Rights Reserved.